sdhc: spi: wait for VDD stable before clocking
The SD physical layer specification requires that the operating supply
be stable for at least 1 millisecond before providing the required 74
clocks. The maximum VDD ramp time is specified at 35ms, giving a total
minimum delay of 36ms.
Signed-off-by:
Jordan Yates <jordan@embeint.com>
Loading
Please sign in to comment