Bluetooth: Controller: Fix prepare pipeline stall
Fix prepare pipeline from not resuming non-resume events
in pipeline when more than one resume events are present
before a non-resume event.
Signed-off-by:
Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Loading
Please sign in to comment