+10
−16
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
pl330_update() stores a pointer to the thrd->req that finished, which contains a pointer to the corresponding pl330_req. This is done with the pl330_lock held. Then, it iterates through the req_done list, calling the callback for each of the requests that are done. The problem is that the driver releases the lock before calling the callback for each of the callbacks. pl330_submit_req() running in another processor can then acquire the lock and insert another request in one of the thrd->req that hasn't been processed yet, replacing the pointer to pl330_req there. When the callback returns in pl330_update() and the next rqdone is popped from the list, it dereferences the pl330_req pointer to the just scheduled pl330_req, instead of the one that has finished, calling pl330 with the wrong r. This patch fixes this by storing the pointer to pl330_req directly in the list. Signed-off-by:Javi Merino <javi.merino@arm.com> Cc: Jassi Brar <jaswinder.singh@linaro.org> Acked-by:
Jassi Brar <jaswinder.singh@linaro.org> Signed-off-by:
Vinod Koul <vinod.koul@linux.intel.com>
CRA Git | Maintained and supported by SUSTech CRA and CCSE