+57
−0
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
I observed that DL tasks can't be migrated to other CPUs during CPU hotplug, in addition, task may/may not be running again if CPU is added back. The root cause which I found is that DL tasks will be throtted and removed from the DL rq after comsuming all their budget, which leads to the situation that stop task can't pick them up from the DL rq and migrate them to other CPUs during hotplug. The method to reproduce: schedtool -E -t 50000:100000 -e ./test Actually './test' is just a simple for loop. Then observe which CPU the test task is on and offline it: echo 0 > /sys/devices/system/cpu/cpuN/online This patch adds the DL task migration during CPU hotplug by finding a most suitable later deadline rq after DL timer fires if current rq is offline. If it fails to find a suitable later deadline rq then it falls back to any eligible online CPU in so that the deadline task will come back to us, and the push/pull mechanism should then move it around properly. Suggested-and-Acked-by:Juri Lelli <juri.lelli@arm.com> Signed-off-by:
Wanpeng Li <wanpeng.li@linux.intel.com> Signed-off-by:
Peter Zijlstra (Intel) <peterz@infradead.org> Link: http://lkml.kernel.org/r/1427411315-4298-1-git-send-email-wanpeng.li@linux.intel.com Signed-off-by:
Ingo Molnar <mingo@kernel.org>
CRA Git | Maintained and supported by SUSTech CRA and CCSE