+48
−0
+2
−0
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
The IPC implementation in SOF requires sending IPCs serially: we should not send a new IPC command to the firmware before we get an ACK (or time out) from firmware, and the IRQ processing is complete. snd_pcm_period_elapsed() can be called in interrupt context before IRQ_HANDLED is returned. When the PCM is done draining, a STOP IPC will then be sent, which breaks the expectation that IPCs are handled serially and leads to IPC timeouts. This patch adds a workqueue to defer the call to snd_pcm_elapsed() after the IRQ is handled. Signed-off-by:Keyon Jie <yang.jie@linux.intel.com> Signed-off-by:
Pierre-Louis Bossart <pierre-louis.bossart@linux.intel.com> Signed-off-by:
Mark Brown <broonie@kernel.org>
CRA Git | Maintained and supported by SUSTech CRA and CCSE