+10
−0
+2191
−377
File changed.
Preview size limit exceeded, changes collapsed.
+1
−1
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
Add complete support for full hierarchical scheduling, with a cgroups interface. Full hierarchical scheduling is implemented through the 'entity' abstraction: both bfq_queues, i.e., the internal BFQ queues associated with processes, and groups are represented in general by entities. Given the bfq_queues associated with the processes belonging to a given group, the entities representing these queues are sons of the entity representing the group. At higher levels, if a group, say G, contains other groups, then the entity representing G is the parent entity of the entities representing the groups in G. Hierarchical scheduling is performed as follows: if the timestamps of a leaf entity (i.e., of a bfq_queue) change, and such a change lets the entity become the next-to-serve entity for its parent entity, then the timestamps of the parent entity are recomputed as a function of the budget of its new next-to-serve leaf entity. If the parent entity belongs, in its turn, to a group, and its new timestamps let it become the next-to-serve for its parent entity, then the timestamps of the latter parent entity are recomputed as well, and so on. When a new bfq_queue must be set in service, the reverse path is followed: the next-to-serve highest-level entity is chosen, then its next-to-serve child entity, and so on, until the next-to-serve leaf entity is reached, and the bfq_queue that this entity represents is set in service. Writeback is accounted for on a per-group basis, i.e., for each group, the async I/O requests of the processes of the group are enqueued in a distinct bfq_queue, and the entity associated with this queue is a child of the entity associated with the group. Weights can be assigned explicitly to groups and processes through the cgroups interface, differently from what happens, for single processes, if the cgroups interface is not used (as explained in the description of the previous patch). In particular, since each node has a full scheduler, each group can be assigned its own weight. Signed-off-by:Fabio Checconi <fchecconi@gmail.com> Signed-off-by:
Paolo Valente <paolo.valente@linaro.org> Signed-off-by:
Arianna Avanzini <avanzini.arianna@gmail.com> Signed-off-by:
Jens Axboe <axboe@fb.com>
File changed.
Preview size limit exceeded, changes collapsed.
CRA Git | Maintained and supported by SUSTech CRA and CCSE