+12
−51
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
There was some old cold that dealt with complete_rq being called prior to the lldd returning the io completion. This is garbage code. The complete_rq routine was being called after eh_timeouts were called and it was due to eh_timeouts not being handled properly. The timeouts were fixed in prior patches so that in general, a timeout will initiate an abort and the reset timer restarted as the abort operation will take care of completing things. Given the reset timer restarted, the erroneous complete_rq calls were eliminated. So remove the work that was synchronizing complete_rq with io completion. Reviewed-by:Johannes Thumshirn <jthumshirn@suse.de> Signed-off-by:
James Smart <james.smart@broadcom.com> Signed-off-by:
Sagi Grimberg <sagi@grimberg.me>
CRA Git | Maintained and supported by SUSTech CRA and CCSE