+2
−1
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
Problem: sched_fork() has always called scheduler_tick() in some (unlikely) circumstances in order to update the current task in light of those circumstances. It has always been the case that the work done by scheduler_tick() was more than was required to handle the problem in hand but no harm was done except for the waste of a few CPU cycles. However, the splitting of scheduler_tick() into two procedures in 2.6.20-rc1 enables the wasted cycles to be saved as the new procedure task_running_tick() does all the work that is required to rectify the problem being handled. Solution: Replace the call to scheduler_tick() in sched_fork() with a call to task_running_tick(). Signed-off-by:Peter Williams <pwil3058@bigpond.com.au> Acked-by:
Ingo Molnar <mingo@elte.hu> Signed-off-by:
Linus Torvalds <torvalds@osdl.org>
CRA Git | Maintained and supported by SUSTech CRA and CCSE