+24
−9
+1
−0
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
During the period that a work queue is scheduled (queued up for run) but hasn't been run, second schedule_work() could fail. This may not lead to the loss of queries because QR_EC is always ensured to be submitted after the work queue has been in the running state. The event handling work queue can be changed into the loop style to allow us to control the code in a more flexible way: 1. Makes it possible to add event=0x00 termination condition in the loop. 2. Increases the thoughput of the QR_EC transactions as the 2nd+ QR_EC transactions may be handled in the same work item used for the 1st QR_EC transaction, thus the delay caused by the 2nd+ work item scheduling can be eliminated. Except the logging message changes and the throughput improvement, this patch is just a funcitonal no-op. Signed-off-by:Lv Zheng <lv.zheng@intel.com> Tested-by:
Gabriele Mazzotta <gabriele.mzt@gmail.com> Tested-by:
Tigran Gabrielyan <tigrangab@gmail.com> Tested-by:
Adrien D <ghbdtn@openmailbox.org> Signed-off-by:
Rafael J. Wysocki <rafael.j.wysocki@intel.com>
CRA Git | Maintained and supported by SUSTech CRA and CCSE