+29
−20
+17
−5
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
Mahesh Bandewar says:
====================
link-status fixes for mii-monitoring
The mii monitoring is divided into two phases - inspect and commit. The
inspect phase technically should not make any changes to the state and
defer it to the commit phase. However detected link state inconsistencies
on several machines and discovered that it's the result of some
inconsistent update to link states and assumption that you *always* get
rtnl-mutex. In reality when trylock() fails to acquire rtnl-mutex, the
commit phase is postponed until next mii-mon run. At the next round
because of the state change performed in the previous inspect-run, this
round does not detect any changes and would skip calling commit phase.
This would result in an inconsistent state until next link event happens
(if it ever happens).
During the the commit phase, it's always assumed that speed and duplex
fetch is always successful, but that's always not the case. However the
slave state is marked UP irrespective of speed / duplex fetch operation.
If the speed / duplex fetch operation results in insane values for either
of these two fields, then keeping internal link state UP is not going to
provide fruitful results either.
Please see into individual patches for more details.
====================
Signed-off-by:
David S. Miller <davem@davemloft.net>
CRA Git | Maintained and supported by SUSTech CRA and CCSE