+18
−1
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
POWER9 SMT8 cores consist of two groups of threads, where threads in each group shares L1-cache. The scheduler is not aware of this distinction as the current sched-domain hierarchy has all the threads of the core defined at the SMT domain. SMT [Thread siblings of the SMT8 core] DIE [CPUs in the same die] NUMA [All the CPUs in the system] Due to this, we can observe run-to-run variance when we run a multi-threaded benchmark bound to a single core based on how the scheduler spreads the software threads across the two groups in the core. We fix this in this patch by defining each group of threads which share L1-cache to be the SMT level. The group of threads in the SMT8 core is defined to be the CACHE level. The sched-domain hierarchy after this patch will be : SMT [Thread siblings in the core that share L1 cache] CACHE [Thread siblings that are in the SMT8 core] DIE [CPUs in the same die] NUMA [All the CPUs in the system] Signed-off-by:Gautham R. Shenoy <ego@linux.vnet.ibm.com> Signed-off-by:
Michael Ellerman <mpe@ellerman.id.au>
CRA Git | Maintained and supported by SUSTech CRA and CCSE