+58
−16
+2
−2
+8
−2
+2
−2
+6
−4
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
When both blocking and completion callbacks are queued for lock,
the dlm would always deliver the completion callback (cast) first.
In some cases the blocking callback (bast) is queued before the
cast, though, and should be delivered first. This patch keeps
track of the order in which they were queued and delivers them
in that order.
This patch also keeps track of the granted mode in the last cast
and eliminates the following bast if the bast mode is compatible
with the preceding cast mode. This happens when a remotely mastered
lock is demoted, e.g. EX->NL, in which case the local node queues
a cast immediately after sending the demote message. In this way
a cast can be queued for a mode, e.g. NL, that makes an in-transit
bast extraneous.
Signed-off-by:
David Teigland <teigland@redhat.com>
CRA Git | Maintained and supported by SUSTech CRA and CCSE