+72
−3
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
It's possible for the driver to initiate an FLOGI and before it completes, another link down/up transition occurs requiring a new FLOGI. Currently, nothing is done to abort/noop the older FLOGI request to the adapter, so if this transition occurs and the FLOGI completion is received after the link down/up transition, the driver may erroneously act on the older FLOGI. In most cases, the adapter properly terminates/fails the FLOGI, but there is a timing condition where the FLOGI may complete on the wire prior to the transition, but the response may not be seen/processed by the driver before the driver sees the link transition. Fix by having the link down handler in the driver run through any outstanding ELS's and change the completion handler of the ELS so that it will be no-op'd and released. Signed-off-by:Dick Kennedy <dick.kennedy@broadcom.com> Signed-off-by:
James Smart <jsmart2021@gmail.com> Signed-off-by:
Martin K. Petersen <martin.petersen@oracle.com>
CRA Git | Maintained and supported by SUSTech CRA and CCSE