+73
−5
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
The problem: After moving an interrupt when is it safe to teardown the data structures for receiving the interrupt at the old location? With a normal pci device it is possible to issue a read to a device to flush all posted writes. This does not work for the oldest ioapics because they are on a 3-wire apic bus which is a completely different data path. For some more modern ioapics when everything is using front side bus delivery you can flush interrupts by simply issuing a read to the ioapic. For other modern ioapics emperical testing has shown that this does not work. So it appears the only reliable way to know the last of the irqs from an ioapic have been received from before the ioapic was reprogrammed is to received the first irq from the ioapic from after it was reprogrammed. Once we know the last irq message has been received from an ioapic into a local apic we then need to know that irq message has been processed through the local apics. Signed-off-by:Eric W. Biederman <ebiederm@xmission.com> Signed-off-by:
Linus Torvalds <torvalds@linux-foundation.org>
CRA Git | Maintained and supported by SUSTech CRA and CCSE