+1
−1
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
While debugging the crash with the bad nr_running accounting, I hit another bug where, after running my sched deadline test, I was getting failures to take a CPU offline. It was giving me a -EBUSY error. Adding a bunch of trace_printk()s around, I found that the cpu notifier that called sched_cpu_inactive() was returning a failure. The overflow value was coming up negative? Talking this over with Juri, the problem is that the total_bw update was suppose to be made by dl_overflow() which, during my tests, seemed to not be called. Adding more trace_printk()s, it wasn't that it wasn't called, but it exited out right away with the check of new_bw being equal to p->dl.dl_bw. The new_bw calculates the ratio between period and runtime. The bug is that if you set a deadline, you do not need to set a period if you plan on the period being equal to the deadline. That is, if period is zero and deadline is not, then the system call should set the period to be equal to the deadline. This is done elsewhere in the code. The fix is easy, check if period is set, and if it is not, then use the deadline. Cc: Juri Lelli <juri.lelli@gmail.com> Cc: Ingo Molnar <mingo@kernel.org> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Andrew Morton <akpm@linux-foundation.org> Signed-off-by:Steven Rostedt <rostedt@goodmis.org> Signed-off-by:
Peter Zijlstra <peterz@infradead.org> Link: http://lkml.kernel.org/r/20140219135335.7e74abd4@gandalf.local.home Signed-off-by:
Thomas Gleixner <tglx@linutronix.de>
CRA Git | Maintained and supported by SUSTech CRA and CCSE