+45
−2
+1
−0
+16
−1
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
A controller may have an internal state that is not able to successfully process commands for a short duration. In such states, an immediate command requeue is expected to fail. The driver may exceed its max retry count, which permanently ends the command in failure when the same command would succeed after waiting for the controller to be ready. NVMe ratified TP 4033 provides a delay hint in the completion status code for failed commands. Implement the retry delay based on the command completion status and the controller's requested delay. Note that requeued commands are handled per request_queue, not per individual request. If multiple commands fail, the controller should consistently report the desired delay time for retryable commands in all CQEs, otherwise the requeue list may be kicked too soon. Signed-off-by:Keith Busch <keith.busch@intel.com> Reviewed-by:
Sagi Grimberg <sagi@grimberg.me> Signed-off-by:
Christoph Hellwig <hch@lst.de> Signed-off-by:
Jens Axboe <axboe@kernel.dk>
CRA Git | Maintained and supported by SUSTech CRA and CCSE