+1
−2
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
I have seen RX stalls on a machine that experienced a suspected OOM. After the stall, the RX buffer is empty on the guest side and there are exactly 16 entries available on the host side. As the number of entries is less than that required by a maximal skb, the host cannot proceed. The guest did not have a refill job scheduled. My diagnosis is that an OOM had occured, with the delayed refill job scheduled. The job was able to allocate at least one skb, but not enough to overcome the minimum required by the host to proceed. As the refill job would only reschedule itself if it failed completely to allocate any skbs, this would lead to an RX stall. The following patch removes this stall possibility by always rescheduling the refill job until the ring is totally refilled. Testing has shown that the RX stall no longer occurs whereas previously it would occur within a day. Signed-off-by:Herbert Xu <herbert@gondor.apana.org.au> Acked-by:
Rusty Russell <rusty@rustcorp.com.au> Signed-off-by:
David S. Miller <davem@davemloft.net>
CRA Git | Maintained and supported by SUSTech CRA and CCSE