+2
−0
+31
−0
+26
−36
+1
−0
+1
−0
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
Controllers which support PMP have various restrictions on which combinations of commands are allowed to what number of devices concurrently. This patch implements ops->qc_defer() which determines whether a qc can be issued at the moment or should be deferred. If the function returns ATA_DEFER_LINK, the qc will be deferred until a qc completes on the link. If ATA_DEFER_PORT, until a qc completes on any link. The defer conditions are advisory and in general ATA_DEFER_LINK can be considered as lower priority deferring than ATA_DEFER_PORT. ops->qc_defer() replaces fixed ata_scmd_need_defer(). For standard NCQ/non-NCQ exclusion, ata_std_qc_defer() is implemented. ahci and sata_sil24 are converted to use ata_std_qc_defer(). ops->qc_defer() is heavier than the original mechanism because full qc is prepped before determining to defer it, but various information is needed to determine defer conditinos and fully translating a qc is the only way to supply such information in generic manner. IMHO, this shouldn't cause any noticeable performance issues as * for most cases deferring occurs rarely (except for NCQ-aware cmd-switching PMP) * translation itself isn't that expensive * once deferred the command won't be repeated until another command completes which usually is a very long time cpu-wise. Signed-off-by:Tejun Heo <htejun@gmail.com> Signed-off-by:
Jeff Garzik <jeff@garzik.org>
CRA Git | Maintained and supported by SUSTech CRA and CCSE