+40
−3
+3
−3
+4
−4
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
Scheduler accounts both softirq and interrupt processing times to the currently running task. This means, if the interrupt processing was for some other task in the system, then the current task ends up being penalized as it gets shorter runtime than otherwise. Change sched task accounting to acoount only actual task time from currently running task. Now update_curr(), modifies the delta_exec to depend on rq->clock_task. Note that this change only handles CONFIG_IRQ_TIME_ACCOUNTING case. We can extend this to CONFIG_VIRT_CPU_ACCOUNTING with minimal effort. But, thats for later. This change will impact scheduling behavior in interrupt heavy conditions. Tested on a 4-way system with eth0 handled by CPU 2 and a network heavy task (nc) running on CPU 3 (and no RSS/RFS). With that I have CPU 2 spending 75%+ of its time in irq processing. CPU 3 spending around 35% time running nc task. Now, if I run another CPU intensive task on CPU 2, without this change /proc/<pid>/schedstat shows 100% of time accounted to this task. With this change, it rightly shows less than 25% accounted to this task as remaining time is actually spent on irq processing. Signed-off-by:Venkatesh Pallipadi <venki@google.com> Signed-off-by:
Peter Zijlstra <a.p.zijlstra@chello.nl> LKML-Reference: <1286237003-12406-7-git-send-email-venki@google.com> Signed-off-by:
Ingo Molnar <mingo@elte.hu>
CRA Git | Maintained and supported by SUSTech CRA and CCSE