+1
−1
Loading
Gitlab 现已全面支持 git over ssh 与 git over https。通过 HTTPS 访问请配置带有 read_repository / write_repository 权限的 Personal access token。通过 SSH 端口访问请使用 22 端口或 13389 端口。如果使用CAS注册了账户但不知道密码,可以自行至设置中更改;如有其他问题,请发邮件至 service@cra.moe 寻求协助。
Problem: In the function __migrate_task(), deactivate_task() followed by activate_task() is used to move the task from one run queue to another. This has two undesirable effects: 1. The task's priority is recalculated. (Nowhere else in the scheduler code is the priority recalculated for a change of CPU.) 2. The task's time stamp is set to the current time. At the very least, this makes the adjustment of the time stamp before the call to deactivate_task() redundant but I believe the problem is more serious as the time stamp now holds the time of the queue change instead of the time at which the task was woken. In addition, unless dest_rq is the same queue as "current" is on the time stamp could be inaccurate due to inter CPU drift. Solution: Replace the call to activate_task() with one to __activate_task(). Signed-off-by:Peter Williams <pwil3058@bigpond.net.au> Cc: Ingo Molnar <mingo@elte.hu> Signed-off-by:
Andrew Morton <akpm@osdl.org> Signed-off-by:
Linus Torvalds <torvalds@osdl.org>
CRA Git | Maintained and supported by SUSTech CRA and CCSE