Skip to content
Commit 9a4b5e1d authored by Ming Shao's avatar Ming Shao Committed by Anas Nashif
Browse files

ztest: Add test duration to summary for new ztest



Add duration stats at both suite level and unit test
level into test summary. The duration is at second
level. Since the new ztest fx can execute a test suite
for multiple times, the worst/longest test duration is
collected.

Note that even a skipped test can have a duration greater
than 0 because the skip operation itself is not free.

Signed-off-by: default avatarMing Shao <ming.shao@intel.com>
parent cce1ec6f
Loading
Loading
Loading
Loading
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Please to comment