Arrangement of Marine Cruises (11 days, 8 days and 7 nights at sea)
D1: At 8:00 am, the investigation team and the chief scientist team will gather at SUSTech for the training of deck
instruments and instrument operation procedures. In the afternoon, the teacher will introduce the arrangement of the
Marine Cruises, the weather, sea conditions, waves, typhoons and other processes, as well as the pre-training of
maritime safety practice.
D2: At 8:00 a.m., the introduction of scientific problems, the analysis of the results of numerical model prediction of sea
conditions, the introduction of data analysis methods, and the cooperative operation training of the marine cruises; In the
afternoon, we will gather at SUStech together to survey the ship dock, and live near the dock.
D3: At 7:00 a.m., we will board the ship and enter the living warehouse. We will take part in the loading, fixing and
inventory inspection of instruments and equipment. Matters needing attention during the Marine Cruises at sea,
arrangement of routes and observation points, investigation of the anchorage opposite to the berth at night, safety
training (need to record video). At 8 p.m., the meeting concluded, the team rested at 9 p.m., and the chief scientist was
on duty all night. Personnel counting and status report will be conducted at 7 am and 8 PM.
D4: At 7:00 a.m., the teacher will explain the specifications and methods of Marine Cruises. In the afternoon, the
laboratory equipment and deck equipment were unpacked, installed, fixed and debugged. All the team members will be
carried out the preview of deck operation and laboratory operation to rationalize the cooperative mechanism. Personnel
safety, equipment safety, data safety inspection and camera escape will be carried out throughout the day. At 6:00 p.m.,
We will have a regular meeting summary and team rest. The survey ship will sail to survey the sea, the chief scientist are
on duty overnight. Personnel counting and status report will be conducted at 7 am and 8 PM.
D5: At 7:00 a.m., in accordance with the scheduled timetable, the team will be classified in different group. The
measurement of water depth, the current observations, transparency, sea water temperature observation, the surface
meteorological observation and laboratory data processing will be carried out in group. For section observation, some, of
a section of the three or four position parameter survey class 3, deck crew and laboratory operations per shift points, and
turn on each other, At the end of each station, data interchange and quality control should be carried out. Personnel
counting and status report will be conducted at 7 am and 8 PM.
D6: We will analyze the sample data, continue to carry out the continuous large-area investigation, and continuously
collect the data of deck culture experiment. Relative parameters such as dissolved oxygen and nutrient salt were tested
according to instrument data and laboratory data. Particulate matter collection and treatment, marine biological sample
collection and treatment will be done. Instrument calibration and data quality control are carried out on the basis of the
obtained field data of physical ocean current measurement and temperature and salt depth. The deck and laboratory
teams work together to process sediment samples, including surface sediment sampling and box sampler sampling.
About one section will be conducted all day, and 3-4 stations will be surveyed with full parameters. The operation will be
finished at 8:00 PM. The regular meeting will be concluded. At the end of each station, data interchange and quality
control should be carried out. Personnel counting and status report will be conducted at 7 am and 8 PM.
D7-D8: All two days, continuous station survey and continuous station sampling will be carried.out. To collect samples,
for the analysis of various physical, chemical, biological and geological ocean observation, deck crew assignments for
per hour and laboratory operations for every three hours will be carried out at the whole a day. The work will be finished
at 4 PM of D8. The survey ships will go to the D5 section where the key position of navigation. Personnel counting and
status report will be conducted at 7 am and 8 PM.
D9: At 7:00 a.m., we will observe of the large area station of key stations again. Sample collection and analysis will be
carried out at the two stations respectively. It will be finished at 4:00 PM. Regular meeting will be concluded. Chief
scientist will take turn on duty all day. Survey ship will be returned. Personnel counting and status report will be